Logo do repositório
  • Português do Brasil
  • Español
  • English
  • Català
  • Čeština
  • Deutsch
  • Français
  • Gàidhlig
  • Italiano
  • Latviešu
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Srpski (lat)
  • Suomi
  • Svenska
  • Türkçe
  • Tiếng Việt
  • Қазақ
  • বাংলা
  • हिंदी
  • Ελληνικά
  • Српски
  • Yкраї́нська
  • Entrar
    Novo usuário? Clique aqui para cadastrar. Esqueceu sua senha?
Logo do repositório
  • Comunidades e Coleções
  • Tudo no Redifal
Sobre
  • Apresentação
  • Política
  • Como Publicar
  • Contato
  • Português do Brasil
  • Español
  • English
  • Català
  • Čeština
  • Deutsch
  • Français
  • Gàidhlig
  • Italiano
  • Latviešu
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Srpski (lat)
  • Suomi
  • Svenska
  • Türkçe
  • Tiếng Việt
  • Қазақ
  • বাংলা
  • हिंदी
  • Ελληνικά
  • Српски
  • Yкраї́нська
  • Entrar
    Novo usuário? Clique aqui para cadastrar. Esqueceu sua senha?
  1. Início
  2. Pesquisar por Autor

Navegando por Autor "Santos, Jennifer Ataide dos"

Agora exibindo 1 - 1 de 1
Resultados por página
Opções de Ordenação
  • Carregando...
    Imagem de Miniatura
    Item
    Análise de custo de edificações residenciais com placas cimentícias com pérolas de EPS e alvenaria comum utilizando o BIM
    (2026-03-25) Santos, Jennifer Ataide dos; Costa, Esdras Jonathan Honorato; http://lattes.cnpq.br/6045970740812728; Limeira, Uziel Ribeiro; http://lattes.cnpq.br/2469128647529432; Almeida, Thamyrys Morgana Pontes de; http://lattes.cnpq.br/8249520310546287
    This study presents a comparative analysis between the Lightwall construction system and conventional masonry applied to a small-scale residential building, focusing on execution costs and productivity. Through Building Information Modeling (BIM), accurate quantity takeoffs were obtained, enabling a detailed economic assessment of both construction methods. The results reveal significant differences between the analyzed systems. Although the Lightwall system presents higher material costs, its increased productivity and substantial reduction in labor demand resulted in an overall cost approximately 27.96% lower than that of conventional masonry. Furthermore, the execution time was considerably reduced, with a decrease of about 84.13%, highlighting the potential of the industrialized system in optimizing construction schedules. Based on these findings, the study indicates that the Lightwall system is an economically competitive alternative, particularly in scenarios that require faster construction processes. In this context, the research contributes to the discussion on the adoption of industrialized construction systems in Brazil, encouraging a broader perspective in decision-making within the construction sector.

Instituto Federal de Educação, Ciência e Tecnologia de Alagoas

  • Configurações de Cookies
  • Enviar uma Sugestão

DSpace software copyright © 2002-2026 LYRASIS